Industrial spare and wear parts delivered to Sweden
Your self-monitoring does not pause, so an order is not a procurement step — it is a file entry with a date on it. On shukchok it writes itself instead of being reassembled from a mailbox later.


Your rhythm on site
In Sweden a purchase record is not internal paper
The self-monitoring regulation, Egenkontrollförordningen (1998:901), requires in its § 5 documented routines showing that plant is demonstrably kept in good condition. That one sentence changes what an order is: what was replaced, against which specification and when is evidence the authority can ask to see.
Which is why the awkward moment is never the price. It is the reply you have to reconstruct from a mailbox, a delivery note and somebody’s memory of a phone call in March.
So the paper trail here is a by-product rather than an extra task: the grade and the operating limits stay visible at the article after the order, your order number and cost centre reach the invoice, and the invoice sits as a PDF in the account once payment has cleared.
- 114 articles, every one with a structured specification table in eight interface languages
- The table stays at the article, so the next selection runs against the same figures
- Order number and cost centre in the basket without an account, both on the invoice
- range of SEK per EUR between 30 Dec 2015 and 14 Sep 2023
- 9.14 – 11.94
- Riksbank, series SEKEURPMI — about 31 % over a decade, and the reason this range is cut for wear parts
- German VAT against a momsregistreringsnummer on file; 25 % is the fallback
- 0 %
- Shop tax settings, from the EU Commission Taxes in Europe database
- order value from which shipping in the EU zone is free
- 250 €
- Shop shipping settings — the basket runs in euros, so the threshold applies here
- articles carrying a structured technical specification table
- 114 / 114
- Counted via the Storefront API, 8 August 2026

What the marketplace changes
The krona floats. Your filter element does not care.
shukchok is an open marketplace for industrial goods — many suppliers, one basket, and the arithmetic is in euros. Sweden is not in ERM II and the krona moves. This shop prices in euros, and on a large single purchase that exposure belongs in the calculation before the order rather than after it. On a filter element ordered every quarter it is noise, and that is the honest cut: this range is built for repeat purchasing.
Repeat purchasing is also where a marketplace earns its place. A conditioning train is rarely one brand, so several manufacturers go into one basket, one checkout and one payment — and whatever a Swedish round needs beyond today’s range is a free shelf: suppliers list here at no charge, keep their prices and deliver through the same basket.
- Signed in, the article shows how often and when you last drew it
- A whole past order can be re-added at once
- Intra-EU: no customs border, DAP, nothing collected at the door
The demand on the ground
Three Swedish plant types, three wear patterns, one basket
From the type of plant to the part it wears out. The right-hand column names only categories that hold stock today.
| Plant type in Sweden | What it consumes | Where in the range |
|---|---|---|
| Refinery and biorefinery under Seveso obligations (Gothenburg) | Continuous emission and safety monitoring; the grade decides the selection, not the price | Gas coolers, gas analysis, separators and filters |
| Waste-fired combined heat and power (Stockholm, Malmö) | Sample conditioning on a fixed interval: coolers, PTFE elements, water separators, hose | Gas coolers, separators and filters, filters and strainers |
| District heating network and steam distribution | Traps, reducing and safety valves, strainers — replaced in batches after a survey | Industrial and shut-off valves, heat exchangers and pressure vessels |
| Pharmaceutical and peptide production under intensified supervision (Malmö) | Documented grades and a traceable replacement of seals and sight glasses | Seals, sight glasses |
The range behind it
Categories that fit Swedish plant
Gas analysisSampling and conditioning for monitoring that does not pause.
Separators, filters and purifiersWater separators and elements ahead of the instrument.
Industrial and shut-off valvesDistrict heating and process steam.
SealsResistance decided from the table, and the table stays on record.
Sight glassesStainless, for lines that have to be inspected.
Heat exchangers and pressure vesselsPlus the gaskets that age faster than the plates.
Two ways in
Order with a record that survives an inspection
Specification table at every article, your order number and cost centre on the invoice, invoice PDF in the account after payment. And if you supply this market: shelf space here is free.