Spare parts for heating plants and export manufacturing in Wrocław

Your flue gas path has been rebuilt, so its new measuring points, temperature profiles and intervals are not resupply — they are a calendar with no framework contract behind it. What is on it is priced here.

Small combined heat and power plant beside a canalised river with a weir and a lock: a clad boiler house with a slim stack, a filter tower, an air-cooled block, a tall storage tank with a spiral stair, IBC totes on the apron and a pipeline with handwheel gate valves.
Wasserabscheider aus Edelstahl mit rundem Schauglas in der Fronttür, blauem Handventil am Deckel und rotem Kugelhahn am Boden, VA-Siebeinsatz links daneben

Two rebuilds at once

One station is being run out. The other is being run in. Neither buys to plan.

A heat accumulator adds valve stations that did not exist before. A coal exit fixed for 2030 turns everything until then into transitional operation, kept running rather than replaced. A newly started gas block spends its first year correcting intervals against practice.

That is maintenance demand with a known end date — the opposite of a framework contract. It arrives in bursts, it mixes manufacturers, and it has to be selected on specification instead of a supplier list.

Which is what a table at every item is for.

  • Material, operating limits and design at all 114 items, in eight languages
  • Net prices visible before you sign in, so a check costs seconds not an enquiry
  • Several manufacturers in one basket, one checkout, one payment

The two stations

Five kilometres apart, and almost nothing in common on the parts list

Figures as published by the operators and the regional press.

One is being run out, the other run in, and a single framework agreement fits neither. A catalogue with open prices and a full table does.
PlantDataWhere the parts demand comes from
Station on ul. Łowiecka263 MW electrical, 812 MW thermal; flue gas desulphurisation and denitrification since 2014/15; coal exit by 2030A long transitional operation: measurement, steam duty and sealing on plant that will not be replaced before the deadline
Czechnica-2In service since 29 May 2025; 179 MW electrical; two gas turbines with two heat recovery boilers and supplementary firing; a 13,000 m³ heat accumulatorA newly commissioned line in its adjustment year — intervals and materials get corrected against practice
Dampfentlüfter Spirax Sarco AV13, Typenschild mit PMA 16 bar, TMA 250°C, PMO 13 bar

For an exporting works

You already invoice in euros. On shukchok you buy in the same currency.

shukchok is an open marketplace for industrial goods with a single pricing axis, and Wrocław is the clearest case for why that helps: production that works largely for customers outside Poland — one works here exports more than 90 % of its output. For a business in that position, the missing złoty price axis is less of an obstacle than it looks.

Basket, checkout and invoice run in euros, the currency an exporting supplier is usually paid in, and because they do, the 250 € free shipping threshold actually applies. Book internally in złoty and the rate risk stays yours: no rate is stored here, and we quote none.

The same works both ways round. If you manufacture here and already sell abroad, listing your range costs nothing up front — we earn a margin only where a position sells.

  • No customs border, delivery DAP, nothing collected at your door
  • 0 % VAT with a confirmed NIP-EU number, 23 % without one
  • Listing without a fee, without a monthly charge and without an approval queue

What else generates demand

Four operations in the city that consume the same categories

  • An export works above 90 %

    The largest European production centre of an American group employs more than 3,000 people here and is building a biopharmaceutical depth filtration line for 146 million US dollars — clean media, documented materials, validated cleaning.

  • Rail vehicle manufacturing

    A rail manufacturer builds on ul. Fabryczna with robot painting and climate-controlled bonding areas. That is surface treatment and extraction, and both wear filters faster than an assembly hall does.

  • Pharmaceutical production at scale

    Two pharmaceutical plants in the city produce 48 million packs and 2.2 billion tablets and sachets a year respectively. At that throughput a cleaning cycle is a wear cycle for every sealing material in the line.

  • Foundry operations under a deadline

    The BAT conclusions for foundries were published on 6 December 2024 with a transposition deadline of 6 December 2028 — abatement and measurement become a dated project rather than an open intention.

Two ways in

Put the retrofit list on paper with a number on it

Quotation PDF from the account, net prices without one, euro pricing either way. And if you manufacture in Lower Silesia, your range belongs in the same basket.

The webshop for the industry