Spare parts for test beds and plant operation in Nuremberg
An engine test bed goes through sample gas coolers, water separators and PTFE filter elements faster than any assembly line beside it. The sampling line is therefore consumption on a calendar. On shukchok its price stands above the specification table, without a login.


Your rhythm on site
Every test hour passes through sample gas conditioning. And that is consumption.
In the southern district, diesel, gas and hydrogen combustion engines from 37 to 1,471 kilowatts are built on around 35 hectares with some 4,000 employees. Engine development means a test bed, a test bed means exhaust measurement, and exhaust measurement means sample gas cooler, water separator and PTFE filter element as consumables — the most direct link between a city and this range.
And then the friction: the test plan is fixed, the filter element is missing, and instead of an order an enquiry round begins with queries about connection and operating limits. A test cell waiting for a consumable costs more than any position on the list.
shukchok is the open marketplace for that: several suppliers for the same sampling line, one basket, and the price up front, before you sign in — the specification table directly underneath, with material, operating limits, design and size. You compare instead of waiting.
- A specification table on all 114 articles — material, operating limits, design
- Full-text search reaches the part number straight from a bill of materials
- Signed in, the article page shows when the same part was last ordered

For suppliers
Three trade fairs a year — and a shelf that is not dismantled in between
Process engineering, refrigeration and sensor technology meet in this city at three trade fairs; one of them runs from 13 to 15 October 2026. Whoever exhibits there buys visibility for a few days. Whoever lists here stands all year in the same category as the position a test bed manager is searching for right now.
That shelf is not dismantled between fairs, and it does not invoice you either: our share arises on a position that sells. Manufacturer and supplier are named at every position, and which of them sells there is named before the order.
And where something is missing today — an EN 10204 inspection certificate, a calibration certificate, a PED category on the article — that is an open slot on the shelf and not an exclusion. It is exactly what an open marketplace is built for: suppliers with those papers store them as article metadata and deliver through the same basket.
- No listing fee, no monthly fee, no manual product approval
- Your range, your prices, published without waiting for a release
The evidence
The order of magnitude behind the consumption
- Power band of the combustion engines built here
- 37–1,471 kW
- Diesel, gas and hydrogen; around 35 ha of works area, some 4,000 employees.
- Waste a year across three incineration lines
- ~ 230,000 t
- Operator figure, ASN; continuous emission monitoring on every line.
- Freight handled at the city port
- > 4.1 million t
- bayernhafen Nuremberg; over 300 ha, over 200 resident companies.
- Share of producing industry in the gross value added of Middle Franconia
- 31.8 %
- IHK Nuremberg; above the national average, with food and feed at EUR 2.3 bn and paper at EUR 1.0 bn.
Asked briefly
Three questions from test bed planning
Do you carry consumables for exhaust measurement?
We need a quotation for the procurement file. Is that possible?
Do we see at the article when we last ordered it?
The range behind it
Categories for sample gas path, workshop and laundry
Two ways in
Put the filter element for the next measurement series in the basket
Connection, material and operating limits sit at the position, the price above it, without a login. Whoever makes such parts lists them here without paying rent for the space.





