Track order·Sign in·
·

Spare parts for plant operation in Berlin

Five incineration lines, a treatment works and a district heating tie-in on one site: the same shift stands at three media on the same day. Three maintenance dates are therefore three enquiry rounds, not three jobs. On shukchok all three parts lists go into one basket, price above the specification table.

Waste-to-energy plant and sewage works on a sandy plain: boiler house with flue gas cleaning, round clarifier basins with scraper bridges, a row of drums on the apron, pine horizon
Schaumstoff-Ringdichtung 76 mm für TINA-Messgerät, Draufsicht

Your rhythm on site

Your maintenance window has a date. Your enquiry round does not.

By spring you know what falls due in autumn. Five incineration lines under continuous measurement, a treatment works that is never shut down, and a steam tie-in into the heat network: three modes of operation on one site, three wear rhythms, all three in the diary.

Then the diary stops. Writing to five suppliers, waiting for queries about material and nominal size, comparing three quotations that mean different things — and goods inwards finds the gasket set in the wrong elastomer compound. The part was there the whole time. The process was not.

That is what shukchok is for: an open marketplace for industrial goods where several manufacturers go into the same basket and the price is up front, before you sign in — material, operating limits, design and size in a table underneath. Berlin sits in the domestic zone, so no customs border and no export declaration — EUR 9.49 for a parcel up to two kilograms.

  • A specification table on all 114 articles — material, operating limits, design
  • Full-text search reaches the part number straight from a bill of materials
  • Purchase order number and cost centre per basket — incineration, treatment works and network stay apart

The demand on the ground

Three media, three wear patterns

  • Five lines under continuous measurement

    Over 500,000 tonnes of waste a year, yielding 2.3 tonnes of high-pressure steam per tonne. Continuous emission monitoring runs on every line around the clock — cooler, PTFE filter element and water separator are recurring consumables inside it, not capital goods.

  • A heat network surveyed in rounds

    A 75 MW wastewater heat pump and a new steam turbine hang the waste heat of the furnace onto the network. A network this size is not repaired one trap at a time but surveyed in rounds — and then twenty positions fall due at once.

  • Digester gas is wet and corrosive

    On the sludge path, material resistance decides, not price. A compound facing the wrong medium does not show up when you order it but when it fails. Which is why the material sits at the position and not in the marketing copy.

The evidence

What sets the rhythm

Waste a year across five incineration lines
> 500,000 t
Operator figure, BSR; in service since 1967.
High-pressure steam per tonne of waste
2.3 t
Operator figure, BSR, for the Ruhleben waste-to-energy plant.
Wastewater heat pump on the district heating feed
75 MW
BEW, Energiedreieck Ruhleben — plus a new steam turbine for the waste heat.
Industrial employees at a 6.4 % share of economic output
107,700
Berlin Partner industry profile. Large in absolute terms, small in relative ones — the demand arises from operating plant.
Konischer dunkler Faltenbalg 90 mm mit breitem Ringkragen und umlaufender Faltenstruktur, Seitenansicht

For suppliers

Your customers are in this text — and the shelf space costs nothing

The 107,700 industrial employees of this city are spread across many sectors rather than a few large production lines. For a manufacturer that means many buyers with small lot sizes and recurring demand — exactly the kind of demand a shop of your own never pays for and a shared marketplace pays for immediately.

Which is why the shelf stands open here, with no fee and no deadline: the earning happens on the margin of a position that actually moves, and nowhere else. Your range and your prices stay your decision; the shop, the checkout, the invoicing and the customer contact are ours.

For you as a buyer it changes the order things happen in: the cooler from the sample gas line, the gasket set for the digester and the shut-off valve for the steam main come from different manufacturers — and still go into one basket and one ordering process.

  • No listing fee, no monthly fee, no manual product approval
  • Manufacturer and supplier are named visibly at every position
  • Signed in, the article page shows when the same part was last ordered

Asked briefly

Three questions from Berlin maintenance desks

Can we order with a cost centre per plant?
Yes. Purchase order number and cost centre are two free fields in the basket, usable without an account, and they appear on the invoice. A default cost centre from the company profile is not pre-filled, and budgets or approval stages are not part of the account.
Do you carry sample gas coolers for continuous emission monitoring?
Yes. The sample gas cooler category holds seven articles, gas analytics another seven, separators and filters eight. Material, connection and operating limits sit in the specification table at each position.
What does carriage to Berlin cost?
Berlin sits in the domestic zone: EUR 9.49 for a parcel up to two kilograms, 19 per cent VAT on the invoice, and from EUR 250 order value no carriage at all. There is no customs border between the dispatch point and your works gate.

Two ways in

Put the first cooler in the basket — or your range beside it

Full-text search reads the specification table, so it also finds 1.4404, PTFE or FKM. If you make or trade these parts, put your range on the shelf beside them — the space is free.

The webshop for the industry