Track order·Sign in·
·

Spare parts for refinery, port and shipyard operations in Gdańsk

An hour at the berth costs more than every seal on the transfer line put together, so the seal is not a spare part — it is berth time with a lead time on it. Its price stands here before you ask for it.

Dampfentlüfter Spirax Sarco AV13, Typenschild mit PMA 16 bar, TMA 250°C, PMO 13 bar

Your job on the quay

You maintain equipment somebody else built. The parts list is theirs, the outage is yours.

Loading arms, pumps, valve stations, transfer lines, ship systems — very little is manufactured here and a great deal is kept running. Which means you often have no maker’s parts list at hand. You have a dimension, a material and an operating condition.

That is exactly how this catalogue is selected. Structured technical data stands at all 114 items, in eight languages, and the net price stands above it without an account or a price request.

Salt air and shift operation do the rest of the arguing.

  • Material, pressure and temperature limits at every item, searchable in full text
  • Uszczelnienia przemysłowe and kompensatory mieszkowe as their own categories
  • Several makers in one basket, one checkout, one payment

What generates the demand

Two procurement clocks running in one port

Figures from operator, port and trade press publications.

The last row is the commercially decisive one: new plant buys valves, existing plant buys spares. Gdańsk is doing both in the same quarter.
FacilityFigureWhat that produces in demand
Refinery10.5 million tonnes of crude processed per yearContinuous emission measurement, an extensive steam and utility network, material-critical sealing
Port80.4 million tonnes handled in 2025, eighth in EuropeLoading arms, pumps, filters and seals in continuous, salt-laden service
Liquid fuel and LPG terminalsA dedicated oil terminal, an LPG terminal and a fully mechanised coal terminalTransfer equipment that runs whenever a ship is alongside — wear driven by cycles, not by hours
ShipyardsFive yards at the portWorkshop consumption: pneumatics, hoses, fittings and seals across many small orders
New transhipment terminalUnder construction, reported at over 90 % completeA plant being fitted out buys first-fit valves and fittings, not replacements

Four port demands

What each of them wants from a supplier

  • Salt air and shift operation

    Seals and bellows wear faster than inland. Material and operating limits stand at every item, so a more resistant equivalent can be identified without an enquiry round.

  • Refinery service

    A wrong elastomer does not fail on delivery, it fails in service. Full text search reaches a steel grade, PTFE or FKM through the table itself rather than through a brand index.

  • Yard workshops

    Many small parts, small quantities, several makers per order. One basket and one payment replace five procurement processes that each have to be posted.

  • A terminal being fitted out

    A quotation PDF with a running number and 30 days of validity is the paper a first-fit file needs. One position per quotation, in German or English.

Universalfilter mit weißem Kunststoffgehäuse, transparentem Sammelbehälter mit sichtbarem zylindrischen Filterelement, Edelstahl-Haltewinkel mit zwei Befestigungslanglöchern und zwei Steckverschraubungen mit Beschriftung GAS-IN und GAS-OUT

For makers and distributors

A yard buys from two shelves. That is exactly why shukchok is a marketplace.

shukchok is an open marketplace for industrial goods, and the difference is exactly this split: workshop and auxiliary consumption is selected on specification and price. Approval-bound components run on paperwork instead: an inspection certificate to EN 10204, a calibration record, a classification society approval presented at survey. Different suppliers stand behind the two shelves.

That is what it is built for. A maker of approval-bound valves or a distributor with a certificate archive needs no shop of its own here — it lists its range, files the evidence as item metadata and ships through the same basket the workshop side uses. The port purchasing office gets one register that grows in both directions.

Shelf space costs nothing here, because we only earn once a position sells.

  • No listing fee, no monthly fee, no manual approval before publication
  • Certificates and categories filed at the item by the supplier who issues them
  • The workshop side is orderable today; the documented side fills up with you
Shipyard and tanker berth on the Baltic: an empty dry dock with a hull block under a gantry crane, a trestle jetty with a tanker alongside, gas cylinder pallets and skips on the quay, pine dunes, and a refinery skyline in the haze.

One basket, both clocks

A terminal being completed buys first-fit. A refinery and five yards buy replacement. Both run through the same product groups — and through the same checkout.

Two ways in

See the price before the ship sails

Net prices without an account, technical data at every item, one order across makers. And if you carry the papers for the approval-bound shelf, that shelf is open.

The webshop for the industry