Track order·Sign in·
·

Industrial spare parts for Lausanne and the region

What sits behind the quench has to survive wet and alkaline duty; what sits on the district heating flow either takes 175 degrees continuously or does not. A wrong call is therefore not a parts error but an unplanned outage. The material entry for it stands here at the position, priced in francs.

Waste-to-energy plant on a wooded hillside terrace: boiler house with stack, scrubber battery, vineyard terraces below, lake and alpine wall beyond
Dampfentlüfter Spirax Sarco AV13, Typenschild mit PMA 16 bar, TMA 250°C, PMO 13 bar

Your train, stage by stage

The operating values tell you which material is a candidate at all

In the middle of Lausanne a waste-to-energy plant runs whose operating values are known across the whole train: boiler at 400 degrees and 50 bar, district heating flow at 175 degrees, around 113 kilometres of network with over 1,300 building substations, combined heat and power efficiency above 50 per cent.

Anyone looking after such a train reads the material question straight out of those values. What a quotation round supplies is a price — what they need is the operating limit, and that usually arrives only on request.

Here it comes first: material, pressure and temperature limits and design on all 114 articles, the franc price beside them, both without an account.

  • Over 1,300 building substations on around 113 kilometres of network
  • New municipal treatment works on 70,000 square metres, commissioning planned for 2026
  • Full-text search across the specification table, not only the product name

Six stages, six material questions

Where on this train which part wears out

All operating values come from the operator plant documentation. The third column maps which product group wears at each stage.

Figures from the operator documentation on energy production and air pollution control, gathered on 8 August 2026.
StageOperating valueWhere the wear occurs
Boiler400 degrees at 50 barSeals, valves, condensate handling
Two-field electrostatic precipitator45,000 voltsSeals and feed-throughs in the dust section
Quench and caustic scrubberWet, alkaline sectionMaterial resistance in seals and valves
Reheatto 250 degreesHeat exchanger fittings, expansion take-up
DeNOx catalyst and continuous analyserContinuous duty with explicit reference to OPairSample gas coolers, filter elements, water separators in the sample path
District heating flow175 degrees, around 113 km of networkOver 1,300 substations with valves and seals
Konischer dunkler Faltenbalg 90 mm mit breitem Ringkragen und umlaufender Faltenstruktur, Seitenansicht

Beside the framework agreement

The line item missing from the contract is what shukchok is for

shukchok is an open marketplace for industrial goods — several suppliers, one basket, duty paid across the border. Demand in Lausanne is concentrated on two large operators, and they buy through framework agreements. That is not competition but a division of labour: the agreement covers the plannable volume through price lists and named contacts, and that part keeps running there.

Beside it sits the demand no contract foresees — the line item missing from the contract, the part in a design the stores do not hold, the demand arising from a conversion. The new municipal treatment works on 70,000 square metres generates exactly that second kind for years.

And the range is not limited to what sits in it today: manufacturers and distributors list their own programme here free of charge, so the product groups along this flue gas and district heating train grow with the suppliers who join.

  • Visible franc prices without a login, a specification table on all 114 articles
  • One checkout across several manufacturers — a maintenance round becomes one transaction
  • French interface; legal texts and PDF documents in German and English

Three points where this bites

What you actually get out of it

  • The item beside the framework agreement

    What the contract does not carry still has to be bought. Prices sit on the article without an account, in francs — settling the question in minutes rather than in a quotation round.

  • Over 1,300 substations

    A district heating network of that size is maintained in rounds, not one station at a time. Several items from one round go into a single basket and produce one payment.

  • Duty during the order, not at the door

    Across the customs border delivery is duty paid: duty and import charges sit in the order total and nothing is charged on handover. Which delivery term applies to an article is stated on the article.

Two ways in

Choose the part by the stage it sits on

All 114 articles carry a technical specification table; full-text search reaches into it and also finds material designations. And if you manufacture or trade in French-speaking Switzerland yourself: your programme stands here beside ours, free of charge.

The webshop for the industry