Wear parts for Copenhagen’s boiler houses and flue-gas trains
Few addresses, very large plant — so a survey list is not a single part but a window with a date on it. On shukchok it goes into one basket, with your cost centre on it.

Your rhythm on site
At 69 bar, a generic gasket is not a saving
You run two lines taking 25 to 42 tonnes an hour, boilers rated for up to 137 tonnes of steam an hour at 69 bar and 440 °C, up to 63 MW electrical and 247 MW of district heat leaving the site. Behind them sits a five-stage train: electrostatic precipitator, SCR catalyst, three scrubbers, a wet dust filter and a continuous measuring station.
The last stage is the one that costs you. A station that never stops is not an instrument serviced once a year — it consumes coolers, PTFE elements, water separators and hose on an interval you knew months before any supplier did.
And at that pressure the grade decides the part, not the price. So the grade and the pressure and temperature limits stand at the position, before the order, in a table rather than in a reply.
- Two lines at 25–42 t/h · boilers up to 137 t steam/h at 69 bar and 440 °C
- Up to 63 MW electrical and 247 MW of district heat from one site
- Electrostatic precipitator, SCR catalyst, three scrubbers, wet dust filter, continuous station
- steam per boiler, at 69 bar and 440 °C
- 137 t/h
- Operator’s technical description of the city’s waste-to-energy plant
- district heat leaving a single site
- 247 MW
- Operator data, same source
- share of employment held by industry in Copenhagen
- 2.5 %
- Trap Danmark, business and labour market — few addresses, very large plant
- articles whose grade and limits are readable before the order
- 114
- Catalogue as counted on 8 August 2026

What the marketplace changes
A survey produces a list. A list should not become five orders.
shukchok is an open marketplace for industrial goods: several manufacturers, one ordering process — and a survey list lives off exactly that. A brewery, a pharmaceutical works and a large engine works sit in this city, and a second heat and power station in the region has been converted to pellets and straw. What connects them is not their industry, it is their utilities: they all run steam, and they all change traps after a survey rather than one at a time.
That survey produces ten or twenty positions across several manufacturers, and the alternative to one basket is five procurements with five releases. Here the whole list goes through one checkout and one payment — and because this is a marketplace rather than a single range, what is missing today is an open shelf: suppliers list free of charge and deliver through the same basket.
- One basket across manufacturers, one checkout, one payment
- Order number and cost centre without an account, both carried to the invoice
- Intra-EU: no customs border, DAP, free shipping from 250 € of order value
The range behind it
Where to start for a Copenhagen plant
Separators, filters and purifiersWater separators and elements ahead of the instrument.
Gas analysisSampling and conditioning components.
Industrial and shut-off valvesSteam side: brewery, pharmaceuticals, district heating.
SealsThe largest single group, selected on the grade.
Filters and strainersStrainers in the steam line, elements in the sample line.
Two ways in
Check a part against your own operating data
The specification table is at every article, and the search finds part numbers as well as words. And if you supply this kind of plant yourself: listing here costs nothing.