Your new line is still finding its settings, so what it uses up is not a spare part — it is a learning curve with an invoice. What that costs stands at the item here, before anyone opens a framework contract.


Five boilers, two calendars
One plant is being run in. Four have been running since your predecessor’s time.
The first year of a new line is the year of adjustment. Measuring points move, a filter element turns out to last half as long as designed, a sealing material that looked right on paper gets swapped for one that holds. None of that fits a framework contract, because none of it was foreseeable.
Four combined heat and power plants around it run in the opposite rhythm — the oldest of them since 1914. There the interval is known, and the original maker of a valve from that era often no longer supplies it, so selection runs on nominal size, temperature and material instead of a spare part number.
Both patterns want the same thing from a supplier: an answer without a callback.
- Material, operating limits and design at all 114 items, in eight languages
- Signed in, the item page shows when you last ordered exactly that part
- A whole earlier order goes back into the basket in one step
What sits behind it
The newly commissioned line in figures
- waste a year on the extended line
- 265,000 t
- Operator figures for the Warsaw plant after the extension.
- electricity and heat a year, the heat into the municipal network
- 100 / 200 GWh
- Operator figures; officially in service since February 2026.
- contract value of the extension, as published
- PLN 1.668 bn
- Investment sum of a third party — pricing in this shop runs in euros.

What the marketplace changes
shukchok does not undercut a price. It removes four of the five processes.
shukchok is a marketplace for industrial goods where several suppliers share one shelf: the cooler out of the sampling line, the reducer for the heat network and the sight glass for the boiler house come from three manufacturers — and still go into one basket, one checkout and one payment. Where five processes used to be received, checked and posted, one now is.
Your purchase order number and cost centre are two fields in the basket, they need no login, and they run through onto the invoice. In a plant that recharges per boiler house, that is the difference between a posting and a discussion.
- Net prices visible without an account or a price request
- A quotation PDF with a running number, valid 30 days, priced server-side
- One position per quotation, and the PDF exists in German and English
The range behind it
Categories for boiler house and flue gas path
Two ways in
Order the whole flue gas path in one go
History at the item, several manufacturers in one checkout, cost centre on the invoice. And if you supply this kind of plant yourself, your range belongs beside it.