Industrial spare parts for Leeds plants and works
Two filling lines at 48,000 litres an hour do not stop politely, so the gasket in the pasteuriser is not a spare part — it is a running cost with an hour on it. On shukchok it carries a price before you sign in, not a fortnight of enquiries.

Your rhythm on site
A dairy is a steam network with a hygiene requirement
Between the silos and the filler sit pasteurisation, CIP circuits and a bottle plant, and each of those is valves, sealing and heat exchangers under thermal and chemical load at the same time. 250 million litres of milk a year across two lines at 48,000 litres an hour, with over 50,000 bottles an hour blown on site: none of it pauses for a maintenance window.
So the wear is known months ahead. What is not known is how long the replacement takes — five enquiries, a question about material, three quotations measuring different things.
Sounds like a claim. It is a check: material, operating limits, design and size stand in a table at the position, with the price beside them and no login in front of them.
- Specification table on all 114 articles
- Full-text search reaches the part number from the bill of materials
- Purchase order number and cost centre as fields in the basket
- milk processed a year at the Stourton dairy
- 250 m litres
- Packaging Gateway, Arla super dairy Leeds
- per filling line, of which there are two
- 48,000 l/h
- Same source; the site also blows over 50,000 bottles an hour itself
- at the Leeds recycling and energy recovery facility, at 14 MWe
- 179,580 t/a
- Veolia; feeding district heating since March 2020
- enterprise zone across four designated sites
- 142 ha
- Leeds City Council, Leeds City Region Enterprise Zone

What the marketplace changes
Three works, one basket, one ordering process
shukchok is an open marketplace for industrial goods, and in this city it runs both ways: order from it, or sell on it. A dairy that cannot pause, an overhaul shop whose entire output is repaired assemblies, and a recovery facility with a measurement obligation — plus a second one under construction at Newmarket Lane for £150m. Three different wear patterns, one list of delivery addresses, one basket.
The parts come from different manufacturers and still go through one ordering process. Signed in, the article page shows when you last ordered the same part. Over the customs border we deliver duty paid: duty and import VAT are collected in the ordering process and stand in the total you approve, so a Yorkshire store takes in goods rather than a bill from the driver. Which delivery term applies to an article is stated at the article.
- One basket across several manufacturers
- A previous order returns to the basket in one step
- Contract, invoicing and payment handling sit with us
For suppliers
What 1,800 manufacturing businesses can do with an open marketplace
Leeds is the third largest manufacturing centre in the United Kingdom, with roughly 1,800 businesses and around 39,000 employees. Read that as a supplier list as much as a customer list — and listing costs nothing, because we earn on the margin of a position that sells.
- No listing fee, no monthly fee, no manual product approval
- Your range and your prices stay in your hands; the shop, the checkout and the payment handling are ours
- Manufacturer and supplier are named at every position, and so is the seller of that position
- The documented side — an inspection certificate to EN 10204, a calibration record, a category on the article — is filed by the supplier who issues it, as metadata at the line item
- Buyers in eight sales countries reach your range in eight interface languages
The range behind it
What a Leeds maintenance store reorders
Gaskets and sealsThermal and chemical load at the same time — the CIP problem in one part.
Industrial valvesShut-off and control between silo, pasteuriser and filler.
Heat exchangers and pressure vesselsThe heart of pasteurisation, and of the boiler house behind it.
Pipework and fittingsWhat connects the three above, and what fails at the joint.
Two ways in
Order for three works from one list
Prices without registration and the specification at the position. And if you manufacture in Leeds, the shelf beside them is free.