Wear parts for process plant in Malmö
Your site is under supervision, so a replacement is not a job — it is a record with a shelf life. What went in and why stays at the item here.

Your rhythm on site
Fewer plants, longer service lives, and every change on record
Three anchors that once defined industrial Malmö are gone, and what that leaves is not a smaller version of the same city. It is a different buying pattern: fewer plants, longer service lives, and maintenance money where project money used to be.
What carries instead is narrower and, for a parts list, more precise. Peptide production in the Limhamn district is one of five sites worldwide within its group, with 6,000 litres of total reactor capacity, currently being doubled in an investment of around 100 million euro. A waste-fired plant runs four boilers delivering 1,428 GWh of district heat.
Both of them replace on a specification rather than on a project, and both have to be able to show it afterwards. That is the shape of demand a searchable range serves best.
- Peptide production at Limhamn: one of five sites worldwide, 6,000 l reactor capacity
- Waste-fired plant: four boilers, 1,428 GWh of district heat, roughly 68 % of supply in Malmö and Burlöv
- A specification table at all 114 articles, visible before and after the order

What the commercial side looks like
Euros at the checkout, and a threshold that actually bites
Malmö is an intra-EU delivery: no customs border, DAP terms, the EU zone parcel rate, and free shipping from 250 € of order value. Because the basket runs in euros, that threshold applies here in practice rather than only on paper. For a company with a VAT number on file the supply is zero-rated; 25 % is the fallback, and the number is validated for format.
The krona floats, unlike the Danish krone, so a large single purchase belongs in a calculation before the order. For consumables it is an acceptable exposure — and consumables are what a district heating boiler and a supervised production line both order over and over.
- Search terms such as ångfällor, provgaskylare, packningar and synglas lead to the same table
- A lead time stands at the article where it applies; five of the 114 carry one
- Positions from several makers, one checkout and one payment behind them
The range behind it
Categories for a supervised site and a district heating boiler
SealsGrade and operating limits stated per article.
Gas coolersFor the continuous monitoring behind four boilers.
Separators, filters and purifiersWater separators and elements in the sample line.
Industrial and shut-off valvesDistrict heating and process steam.
Heat exchangers and pressure vesselsPlus the gaskets that age before the plates do.
Two ways in
Keep the specification with the order
The table that decided the part stays visible at the article, and your order number and cost centre stay on the invoice. And if you issue the certificates: listing them here costs nothing.