Industrial spare parts for Porto Marghera and Venice
Up to 4,500 contractor workers on a normal day: in Marghera the work is distributed and so is the buying — every job therefore brings its own list with its own date. On shukchok every position shows price, material and size before anyone writes a quotation.


Your job in Marghera
Salt air eats seals. Quotation rounds eat the job date.
You do not order for a store, you order for a job. A mixed list, several manufacturers, everything against one job number — and tomorrow the next list arrives, because in a yard with up to 4,500 contractor workers every day has a scope of its own.
What holds it up is never the part. It is the route to it: asking, waiting for the material query, comparing quotations that mean different designs — and goods inwards turns out to hold the wrong elastomer while the dock keeps its date.
Which is why the price stands here before the login and the specification table next to it: material, operating limits, design and size at every position. You decide at the screen instead of on the phone.
- Price and specification table without a login, on all 114 articles
- Purchase order number and cost centre in the basket, both on the invoice
- Several manufacturers in one basket and one ordering process
- companies in the Porto Marghera industrial zone
- 902
- Around 11,000 direct and 10,000 indirect employees, about 26 billion euro of turnover — Osservatorio Porto Marghera
- suppliers in one purchasing year of the yard
- ≈ 800
- Up to 4,500 contractor workers on a working day — Il Gazzettino
- annual capacity of the biorefinery
- 0.4 Mt
- Operating since 2014, the first conversion of its kind anywhere — Eni
- waste-to-energy capacity inside the zone
- 27.9 MW
- Veritas, Ecoprogetto Fusina

What the marketplace changes
One process instead of four — and a document a funding file can use
A job list never comes from a single source, and shukchok is built for exactly that: an open marketplace for industrial goods with several suppliers side by side. The steam trap for the header, the sight glass on the vessel and the filter from the sampling line come from different manufacturers and still go into one basket and one ordering process — carrying your purchase order number and your cost centre, both of which run through to the invoice.
For the ZLS file there is the matching document: a quotation PDF with a sequential number, valid 30 days, calculated on the server and kept in the customer account. It takes a login and carries exactly one position — for the single investment position a file usually turns on, that is the right size.
- Full-text search reaches the part number without a word of German
- After signing in, a whole earlier order returns to the basket in one step
- EU zone shipping: 24.49 € for a 2 kg parcel, no customs border, delivery term DAP
For manufacturers and distributors
What you get if you list here
If you manufacture or trade seals, valves, bellows or sample gas equipment in the Veneto, the figures above read as a market description. Getting started costs nothing, and that is not a promotional price: we earn on the margin of a position that sells, and on nothing else.
- Free onboarding — no listing fee and no monthly fee
- No manual product approval: your range goes live when you publish it
- Your prices stay yours; checkout, invoicing and payment handling are ours
- Inspection certificate to EN 10204, calibration certificate and PED category as article metadata
- Manufacturer and supplier are named visibly at every position
The range behind it
Categories for a port industrial zone
Two ways in
Order against the job number — or list your range beside it
Purchase order number and cost centre are two fields in the basket, without a login, and they appear on the invoice.





